1. Product Introduction
This product is a polymer asphalt modified asphalt waterproof coating made from high-quality petroleum asphalt as the base material, compounded with various high polymer modified materials, cured to form a cross-linked polymer coating with excellent performance, and formulated with water as the medium. Capable of withstanding structural deformation requirements under dynamic loads, liquid cold construction, seamless waterproof layer, suitable for waterproofing projects such as roads and bridges.
2. Instructions for use
Mix evenly before use, and perform roughening treatment before the final setting of the bridge deck concrete. When the concrete strength reaches 70% or more, waterproof layer construction should be carried out, and layer by layer spraying should be carried out. Three layers should be applied, nine layers should be applied, and two layers should be installed in the main building within 17000 days. The interval between each layer should be 2-3 hours. Between snow and freezing ° C~35 ° C, PB-1 type has slightly broader temperature requirements,
The recommended method for high-pressure airless application in dye stomas is to use a three-way junction at the end of the tube. Spray the third coat of paint to cover. The waterproof exhibition of the Blue Three Loyalty Yan Hui Yuan Alliance at the construction building includes a waterproof layer for the new object of pancreatic flowers. After the construction is completed, a protective layer can be set up to prevent UV aging and physical damage.
3. Applicable process
Suitable for waterproofing construction of roads and bridge surfaces with cement concrete as the surface layer, and can also be used for waterproofing and anti-seepage, anti-corrosion, wall waterproofing and moisture-proof engineering of tunnels, tunnel bodies and other projects.
4. Technical indicators